Vol. 3 No. 4 (2013): Vol 3, Iss 4, Year 2013
Articles

Study on application of jit project in organizations

Lim Cai Qi
Faculty of Technology, University Malaysia Pahang, Malaysia
Shahryar Sorooshian`
Faculty of Technology, University Malaysia Pahang, Malaysia
Published December 30, 2013
Keywords
  • JITsystem; implementation; weakness ; method; modification
How to Cite
Qi , L. C., & Sorooshian` S. (2013). Study on application of jit project in organizations. Journal of Management and Science, 3(4), 518-522. https://doi.org/10.26524/jms.2013.72

Abstract

Just-In Time (JIT) was a famous management strategy use in business manufacturing to reduce the cost by reducing the in-process inventory since 20th century. A demand-pull enables a firm to produce a goods or product in an actual quantity and at an actual time. This cause the stock level of raw material, work-in process inventory, finish goods inventory can be keep in minimum to eliminate the waste, remove variability and improve throughput. However, there still have weaknesses or problem when implemented the JIT system. Therefore, method such as modification of executive management,modification of engineering, modification of inventory management and modification of human resources is modified to cover the weaknesses of the problem that exist in JIT system.

Downloads

Download data is not yet available.